Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the complianz-gdpr domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /home/procosil/public_html/wp-includes/functions.php on line 6114

Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the hello-elementor domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /home/procosil/public_html/wp-includes/functions.php on line 6114

Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the hello-elementor domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /home/procosil/public_html/wp-includes/functions.php on line 6114

Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the wordpress-seo domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /home/procosil/public_html/wp-includes/functions.php on line 6114
Productive Process - Procosil

Productive Process

Productive Process

Design and development of the production process

The whole development process starts from a design sheet, processing sheets for each department, repeated checks carried out in cascade between the departments, to finally arrive at the final testing of the product which is carried out before delivery of the same.
Our production process is based on the pillars provided by the UNI EN ISO 9001:2015 standard.

Legend:

[ DOCUMENTS ]
[ Step ]
[ CONTROLS ]
Estimate / Design Sheet

First Visit

Working Sheet

Imprints / Scan

Control

Working Sheet

Digital Sculpture

Control

-

3D Printing

Control

Working Sheet

Manual Sculpture

Control

Working Sheet

Mold

Control

Working Sheet

Silicone Glove

Control

Working Sheet

Coloring

Control

Working Sheet

Nails

Control

Working Sheet

Overgrown / Finishings

Control

Final Test Sheet

Delivery / Shipping

Control

Invoice / DDT / Declaration of Conformity / Delivery Document

Documentation

Progettazione_Imprint
Cad_Cam
Colore
Rifinitiure